MasterVision®
Gridded Magnetic Steel Dry Erase Project Planning Board, 1" x 2" Cells, 36" x 24", White Surface, Satin Aluminum Frame - BVCMA0392830
$77.63
$309.49
You save
$231.86
- SKU:
- BVCMA0392830
- MPN:
- MA0392830
- Weight:
- 8.78 LBS
Frequently bought together:
Description
Organization is vital for the success of every business or enterprise. Planning boards are excellent tools that allow you to keep planning and tracking on time. Keeping important tasks on display, organizing work-groups or just planning ahead is practical and easy. Pale gray grid lines help ensure easy alignment of text and magnetic accessories. Magnetic lacquered steel dry erase surface is suitable for frequent use and allows you to post notes and messages as well as write. Sturdy aluminum frame features a sliding pen tray and an easy four-corner mounting system. Includes mounting kit.
View AllClose
Product Features
- Magnetic Gold Ultra™ lacquered steel dry erase surface is recommended for frequent use.
- Pale gray grid lines make planning easy and make for a professional-looking board.
- Sliding aluminum pen tray keeps pens and magnetic accessories where you want them.
- Four-corner system for easy mounting.
Item Dimensions
Weight: 8.78 lbs.
Height: 0.98 in
Depth: 42.32 in
Width: 25.98 in
Warranty
Manufacturer's 10-year surface warranty.
Additional Information
Features: |
-Magnetic Gold Ultra™ lacquered steel dry erase surface is recommended for frequent use.-Pale gray grid lines make planning easy and make for a professional-looking board. |